Visual Arts Term 1 2022 year 8

Organised:

  • During the project I think I was running on deadline, as I had made my wall for the mould on time, I had my first lot of cement moulded on time. Also, I had everything ready on time and was doing the right thing at the right time.

Inquisitive:

My process was looking at other brutalist buildings and getting a good design with Lego. But I came across a challenge of overhangs and size. So, I had to change my idea and restart. But I ended up looking at other brutal buildings without overhangs. Then I faced the challenge of size, so I decreased the size of the building by making the entire brutal building compact.

Creative:

The final product looked very creative and looked like it came from imagination, so it was a successful project.

All of our projects
My designs

Leave a Reply

Your email address will not be published. Required fields are marked *